Shed and sewer line
Frame peters shed and side – Mon Tues ~ 18 hrs
sewer line in Tahoe donner – Wed – 6 hrs
Prep for sealing wed afternoon
Frame peters shed and side – Mon Tues ~ 18 hrs
sewer line in Tahoe donner – Wed – 6 hrs
Prep for sealing wed afternoon
4 guys sewer line replacement under double stem wall deck – 10 hrs round trip
changed oil in mini 35, fix blower chute, swap tires. Set shed frame in peters back yard
Finish pulling stuck stakes – 4.5 hrs
finish up grade at Sierra meadows, move equipment
Install floor to ceiling laundry room cabinets, cut in around duct – 2 guys 25 hours
Final plow random 6” storm – 5 hrs missing 1 guy
fillinger – set dresser top, assemble mirror frame, move outlets 6.5 hrs
trim 2 windows at Ivens, base board 1 room, gather tools – 9.5hrs
pull snow stakes 7.5 hrs