Excavation Shed and sewer line May 13, 2021 by eric Frame peters shed and side – Mon Tues ~ 18 hrs sewer line in Tahoe donner – Wed – 6 hrs Prep for sealing wed afternoon
Excavation Sewer line in Tahoma May 6, 2021 by eric 4 guys sewer line replacement under double stem wall deck – 10 hrs round trip
Excavation Tuesday – yard maintenance, set shed foundation May 5, 2021 by eric changed oil in mini 35, fix blower chute, swap tires. Set shed frame in peters back yard
Excavation Snow stakes, finish Sierra meadows septic May 5, 2021 by eric Finish pulling stuck stakes – 4.5 hrs finish up grade at Sierra meadows, move equipment